欢迎访问联博统计,联博统计是用以太坊区块链的高度为数据统计!

澳洲幸运5玩法:KPower gets four-year PPA extension

admin1个月前11

澳洲幸运5玩法www.a55555.net)?澳洲幸运5是澳洲幸运5彩票官方网站,开放澳洲幸运5彩票会员开户、澳洲幸运5彩票代理开户、澳洲幸运5彩票线上投注、澳洲幸运5实时开奖等服务的平台。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

新2会员手机管理端www.hg108.vip)实时更新发布最新最快的新2代理线路、新2会员线路、新2备用登录网址、新2会员手机管理端、新2手机版登录网址、新2皇冠登录网址。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。
上一篇 下一篇

猜你喜欢

网友评论

最新文章
热门文章
热评文章
随机文章
热门标签